    I'm having a problem with the Y-axis of a time-based graph. Because of when the processing is started, I cannot have a traditional 0-24 hour scale. I need something a little different. I have a sample attached of how I would like to have the layout displayed. Can you take a look and let me know where I'm stuck?
    thanks
    christine

  2. #2
    Plutonium Lounger
    Join Date
    Mar 2002
    Posts
    84,353
    Thanks
    0
    Thanked 29 Times in 29 Posts

    Re: Time scale in graph (2003 sp2)

    See the attached version. I inserted two columns that calculate the time from the start of the day to the landmark and to the SLA, and used those in the chart.

  3. #3
    2 Star Lounger
    Join Date
    Aug 2001
    Location
    Boston, Massachusetts, USA
    Posts
    167
    Thanks
    1
    Thanked 0 Times in 0 Posts

    Re: Time scale in graph (2003 sp2)

    Sorry it took so long to confirm. This worked perfectly. I was trying to overcomplicate it. Thanks again!