    Scheduled tasks (SP2)

    I use BackUp My PC software to back up my data daily and my photos weekly on my PC. The jobs created in the software are scheduled to run at times in the wee hours using the Task Scheduler. A problem arises on the day that both jobs are run. If the first job is not complete when the 2nd job is scheduled to begin the 2nd job does not run. Is there any way to tell the Scheduler to begin the 2nd job as soon as the first job is finished?

    TIA,
    Georgette

  2. #2
    Plutonium Lounger
    Join Date
    Mar 2002
    Posts
    84,353
    Thanks
    0
    Thanked 29 Times in 29 Posts

    Re: Scheduled tasks (SP2)

    I don't think so (others will no doubt correct me if I'm wrong). I'd increase the interval between the start times of the two jobs.

  3. #3
    Plutonium Lounger Leif's Avatar
    Join Date
    Dec 2000
    Location
    U.K.
    Posts
    14,010
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Re: Scheduled tasks (SP2)

    I agree with Hans in that I don't believe there is a way to trigger a schedule when an earlier one finishes.

    I don't know Backup My PC software, bus it is possible to create a single 'job' that includes backing up both your data and photos and run that as a single task once a week? (With the data backup job being scheduled to run on the other six days?)

  4. #4
    Administrator
    Join Date
    Mar 2001
    Location
    St Louis, Missouri, USA
    Posts
    23,592
    Thanks
    5
    Thanked 1,059 Times in 928 Posts

    Re: Scheduled tasks (SP2)

    Can you post a screenshot of the settings tab for the tasks?

    Joe
    Joe

  5. #5
    Star Lounger
    Join Date
    Sep 2001
    Location
    Northern Virginia
    Posts
    71
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Re: Scheduled tasks (SP2)

    Screen grabs from the Window's Task Scheduler (all 3 tabs) are attached.
    Thanks,
    gg
    Attached Files Attached Files

  6. #6
    Administrator
    Join Date
    Mar 2001
    Location
    St Louis, Missouri, USA
    Posts
    23,592
    Thanks
    5
    Thanked 1,059 Times in 928 Posts

    Re: Scheduled tasks (SP2)

    On the settings tab of the task that runs weekly try using the idle time section. Have the task run only if the system has been idle for some small period and then retry the task for a period of time that you think should be long enought to let the other task terminate.

    Joe
    Joe

  7. #7
    Star Lounger
    Join Date
    Sep 2001
    Location
    Northern Virginia
    Posts
    71
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Re: Scheduled tasks (SP2)

    I will give it a try... double tasks are run on Monday, so we'll see!

    Thanks for the suggestion,
    gg