    Graphing elapsed times (Excel 2003)

    I have 94 steps in an ETL process. I have a log that captures their start and end times and elapsed times in seconds (see attachment). Can anybody please show me a way to graphically show the ETL process with each data flow step on the y-axis and the times on the x-axis. I want to represent each step and its duration by a solid bar or line between the start and end times.

    Thanks in advance.
    Attached Files Attached Files

  2. #2
    Platinum Lounger
    Join Date
    Feb 2001
    Location
    Weert, Limburg, Netherlands
    Posts
    4,812
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Re: Graphing elapsed times (Excel 2003)

    I seem to recall Jon Peltier has some examples on Gantt charts: http://www.peltiertech.com
    Jan Karel Pieterse
    Microsoft Excel MVP, WMVP
    www.jkp-ads.com
    Professional Office Developers Association

  3. #3
    New Lounger
    Join Date
    Jul 2001
    Location
    Canberra, Australian Capital Territory, Australia
    Posts
    20
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Re: Graphing elapsed times (Excel 2003)

    Jon's links pointed me in an acceptable direction!

    My sincere thanks for pointing me in his direction. :-)