Results 1 to 2 of 2
  1. #1
    3 Star Lounger
    Join Date
    Dec 2001
    Location
    Doorn, Netherlands
    Posts
    311
    Thanks
    0
    Thanked 0 Times in 0 Posts
    I have prepared a scheduled weekly full backup that works, including a retention of 2 last backups. So I have always 3 1 week spaced full backup images available that I can mount.

    My question is how to include the following after a backup is completed:

    1) run a verification
    2) close down the computer

    This should preferably done inside the scheduled task. But how to specify this? It probably should go in Backup|Advanced OptionsIPost-Backup, but how to set up the correct commands (I haven't a clue)?

    Regards, Teunis

  2. #2
    WS Lounge VIP
    Join Date
    Dec 2009
    Location
    Earth
    Posts
    8,199
    Thanks
    48
    Thanked 986 Times in 916 Posts
    I'd check the ShodowProtect web site for help on this one.

    cheers, Paul

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •