    MSP 2007 and 2010 STD Status Field

    The Status Field reports a status as "Future Task" when the start and finish dates are in the past. The Help section does not provide much information except that 'If the task start date is greater than the status date, then the Status field contains Future Task" No indication of what the "Status Date" is or whether it can be set.
    Same results when using MSP 2007 and 2010.
    Is this a known error or do I hae to set the "Status Date" somehow?

  2. #2
    2 Star Lounger
    Join Date
    Apr 2001
    Posts
    122
    Thanks
    7
    Thanked 0 Times in 0 Posts
    After further research I found out where the Status Date is maintained in Project. It is different for 2007 and 2010 but generally under Project variables. In this case it was set to the beginning date for the project, it is now set to Today and Status shows correctly.