    has anyone figured a way to implement critical chain scheduling with MS Project, without an add-on product?

  2. #2
    Super Moderator WebGenii's Avatar
    Join Date
    Jan 2001
    Location
    Redcliff, Alberta, Canada
    Posts
    4,066
    Thanks
    2
    Thanked 5 Times in 5 Posts

    Re: critical chain scheduling (2000)

    Have you tried working with the PERT Tools?

    Cheers
    [b]Catharine Richardson (WebGenii)
    WebGenii Home Page
    Moderator: Spreadsheets, Other MS Apps, Presentation Apps, Visual Basic for Apps, Windows Mobile

  3. #3
    New Lounger
    Join Date
    Apr 2002
    Posts
    4
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Re: critical chain scheduling (2000)

    the PERT tools will help with determining the duration, but don't really address the kind of resource loading and determination of critical chain, buffer calculation and placement, reporting on buffer utilizaiton, etc. that one needs to schedule and manage a project using the critical chain techniques. One add-on tool I know of is Pro-Chain - I was hoping that a reasonably proficient MS Project user could make Project work without added expense for another product.
    -Joe

  4. #4
    Super Moderator WebGenii's Avatar
    Join Date
    Jan 2001
    Location
    Redcliff, Alberta, Canada
    Posts
    4,066
    Thanks
    2
    Thanked 5 Times in 5 Posts

    Re: critical chain scheduling (2000)

    I'll step aside, and await that reasonably proficient user myself ...
    [b]Catharine Richardson (WebGenii)
    WebGenii Home Page
    Moderator: Spreadsheets, Other MS Apps, Presentation Apps, Visual Basic for Apps, Windows Mobile

  5. #5
    Silver Lounger GARYPSWANSON's Avatar
    Join Date
    Aug 2001
    Location
    Frederick, Maryland, USA
    Posts
    1,788
    Thanks
    0
    Thanked 2 Times in 2 Posts

    Re: critical chain scheduling (2000)

    ... I think I will join you in waiting.... don't know anything about MS Project and Critical Chain Scheduling.