    Suitability of Project (2002)

    Hi Project loungers,
    My client is a roofing company with small jobs 3-5 days long. They have about 8 crews working and about 100 jobs in the queue. I am a VBA programmer looking to create a job scheduling system for them. Do you think MS Project would be a good development platform?

  2. #2
    Silver Lounger GARYPSWANSON's Avatar
    Join Date
    Aug 2001
    Location
    Frederick, Maryland, USA
    Posts
    1,788
    Thanks
    0
    Thanked 2 Times in 2 Posts

    Re: Suitability of Project (2002)

    ... I think MS Project could easily and cheaply be used as the job scheduling system without the need for any development. Why create a new system when an off the shelf product designed to do scheduling can already do it.

    What exactly are you inferring to as a development platform and what are you trying to accomplish?
    Regards,

    Gary
    (It's been a while!)

  3. #3
    Star Lounger
    Join Date
    Feb 2001
    Location
    Vancouver, BC, Br. Columbia, Canada
    Posts
    96
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Re: Suitability of Project (2002)

    Hi Gary - I'm going to write the specs today (hopefully) and post them here (they'll be short). If not today, then next week. Thanks for the encouragement.

  4. #4
    Silver Lounger GARYPSWANSON's Avatar
    Join Date
    Aug 2001
    Location
    Frederick, Maryland, USA
    Posts
    1,788
    Thanks
    0
    Thanked 2 Times in 2 Posts

    Re: Suitability of Project (2002)

    Do you intend on using MS Project as a scheduling tool and write code to supplement it or do you think that you will designing something different? I always figure if a tool can meet your requirements without further design, why re-invent the wheel.

    In either event, I will be looking for your specs to see what you are trying to do.

    Good Luck.
    Regards,

    Gary
    (It's been a while!)

  5. #5
    Silver Lounger GARYPSWANSON's Avatar
    Join Date
    Aug 2001
    Location
    Frederick, Maryland, USA
    Posts
    1,788
    Thanks
    0
    Thanked 2 Times in 2 Posts

    Re: Suitability of Project (2002)

    ... when you say Job Scheduling System, are you trying to schedule jobs, workers, or perhaps, both?
    Regards,

    Gary
    (It's been a while!)