    Dates out by 1 day (2002)

    In a new found burst of optimism, I have just used outlook to list a whole lot of tasks that I need to complete. When I use the 'Outlook Today' view, the dates for all tasks (in brackets after the task description) are shown as minus 1 compared with the dates in the 'Tasks' view. If I add a task with today's date, the date in brackets is yesterday's.

    I have checked the settings to the best of my ability but can't see any obvious solution.

    Thanks

  2. #2
    Uranium Lounger
    Join Date
    Dec 2000
    Location
    Salt Lake City, Utah, USA
    Posts
    9,508
    Thanks
    0
    Thanked 6 Times in 6 Posts

    Re: Dates out by 1 day (2002)

    That'll teach you to have a burst of optimism, eh Joe? <img src=/S/grin.gif border=0 alt=grin width=15 height=15> But seriously, this is an odd problem. Is the setting under Outlook | Tools | Options | Calendar | Time Zones the same as the setting in Start | Settings | Control Panel | Date/Time | Time Zone?
    -John ... I float in liquid gardens
    UTC -7ąDS

  3. #3
    2 Star Lounger
    Join Date
    Nov 2001
    Location
    Toowoomba, Queensland, Australia
    Posts
    112
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Re: Dates out by 1 day (2002)

    The two date/time zone settings match.

    Any other thoughts??

  4. #4
    Uranium Lounger
    Join Date
    Dec 2000
    Location
    Salt Lake City, Utah, USA
    Posts
    9,508
    Thanks
    0
    Thanked 6 Times in 6 Posts

    Re: Dates out by 1 day (2002)

    I just looked at mine more closely, and see that Outlook Today shows the Due Date, not the Start or Reminder Date. From Outlook Today, double click on the Date, and see if your Reminder Date is a day after (or bfore?) the Due Date.
    -John ... I float in liquid gardens
    UTC -7ąDS

  5. #5
    2 Star Lounger
    Join Date
    Nov 2001
    Location
    Toowoomba, Queensland, Australia
    Posts
    112
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Re: Dates out by 1 day (2002)

    I just enetered a new task called 'test' with a due date of 16 August. When I return to the Outlook today view the item is shown as test (15-08-03).??