    How to show extended durations? (XP)

    Hi,

    We cannot specify a project duration of greater than 100%. But what if a project extends beyond the expected duration? How can we show this project was extended in MSProjectXP?

    m.q.

  2. #2
    3 Star Lounger
    Join Date
    Mar 2003
    Location
    Beddau, Mid Glamorgan, Wales
    Posts
    289
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Re: How to show extended durations? (XP)

    mq:

    You should save WITH a baseline before entering actual figures. If a project extends beyond the estimated duration, the difference can be viewed using the Varience table (View/Table/Varience).
    (One way of entering actuals is to use the Tracking table.)

    Tony.
    Regards,

    Tony
    [s] [/s]
    www.SylviArtist.com

  3. #3
    2 Star Lounger
    Join Date
    Oct 2003
    Posts
    144
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Re: How to show extended durations? (XP)

    Cheers.