    Give Column Showing Original No. of Days Allocated (2002)

    Hi,

    When you set a baseline for a task & then insert a Tracking GANTT, the "Duration" column updates to reflect the actual no. of

    days taken. I need to have a column which shows the initially allocated no. of days. How can I do that?

    TIA,

    IT Student.

  2. #2
    3 Star Lounger
    Join Date
    Mar 2003
    Location
    Beddau, Mid Glamorgan, Wales
    Posts
    289
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Re: Give Column Showing Original No. of Days Allocated (2002)

    To see the number of days duration at the time the baseline was saved, in your table:

    1. Choose Insert/Column
    2. In the Field Name dropdown choose Baseline Duration.

    This figure will not be affected by Actual figures.

    Tony.
    Regards,

    Tony
    [s] [/s]
    www.SylviArtist.com

  3. #3
    Silver Lounger GARYPSWANSON's Avatar
    Join Date
    Aug 2001
    Location
    Frederick, Maryland, USA
    Posts
    1,788
    Thanks
    0
    Thanked 2 Times in 2 Posts

    Re: Give Column Showing Original No. of Days Allocated (2002)

    Dont forget that you need to set a baseline for this to work.
    Regards,

    Gary
    (It's been a while!)

  4. #4
    2 Star Lounger
    Join Date
    Oct 2003
    Posts
    144
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Re: Give Column Showing Original No. of Days Allocated (2002)

    Thanks Guys.