Results 1 to 2 of 2
  1. #1
    2 Star Lounger
    Join Date
    Jan 2002
    Location
    Delta, Br. Columbia
    Posts
    116
    Thanks
    1
    Thanked 0 Times in 0 Posts

    Calculating Weeks (2000/XP)

    I have a time card table that the user would like to have a report run on. The report has to sum the data for each possible week. i.e. each record has a date in it. Assuming a week starts on Sunday and finishes on Saturday, I want to total the data for each week, regardless of start and end dates of the data in the table. The only way I can think of is to have an arbitrary start date (a Sunday) and calculate each subsequent Saturday and then somehow assign the appropriate week # or ending date to each record for totalling purposes. Any other ideas out there?

  2. #2
    Plutonium Lounger
    Join Date
    Mar 2002
    Posts
    84,353
    Thanks
    0
    Thanked 28 Times in 28 Posts

    Re: Calculating Weeks (2000/XP)

    If you group on the date field in the report, you can specify that the data are to be grouped by week in the Sorting and Grouping window.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •