Results 1 to 3 of 3
  1. #1
    3 Star Lounger
    Join Date
    Jan 2001
    Location
    USA
    Posts
    386
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Scheduling (Access 2000/2003)

    Is there a control in Access, or can I use the control from Outlook, to schedule a recurring appointment.

    I am building a database that will be used to track reports. When they are scheduled, run, and should run next.
    We have several that occur on a given date. That is not an issue. My dilemma is with reports that occur on a given day, second Tuesday, of a month.

    I need a way to find the next occurrence of this report when it is marked complete for the current run.


    Thanks for any help.
    Richard

  2. #2
    Plutonium Lounger
    Join Date
    Mar 2002
    Posts
    84,353
    Thanks
    0
    Thanked 29 Times in 29 Posts

    Re: Scheduling (Access 2000/2003)

    If your goal is to determine the date of the second Tuesday in next month or something similar, try the code from <post:=561,599>post 561,599</post:>.

  3. #3
    3 Star Lounger
    Join Date
    Jan 2001
    Location
    USA
    Posts
    386
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Re: Scheduling (Access 2000/2003)

    That looks like what I need.

    Thanks Hans
    Richard

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •