    Setting up a Flex Fridy Base Calendar (2002 SP2)

    Anyway to automate selecting every other Friday in Project to make a FlexFri base calendar? If I select the two Fridays in a given month (say March 9th and 23rd for this year) and check the 'Non-working time', then is keeps selecting those specific Fridays for the rest of the months, skipping some Fridays (In April 2007, I want the 6th and 20th selected and Project selects the 13th and 27th). Can't seem to figure this one out if anyone has any suggestions...

    Thanks.
    Pooja

  2. #2
    Silver Lounger GARYPSWANSON's Avatar
    Join Date
    Aug 2001
    Location
    Frederick, Maryland, USA
    Posts
    1,788
    Thanks
    0
    Thanked 2 Times in 2 Posts

    Re: Setting up a Flex Fridy Base Calendar (2002 SP2)

    It would probably take a lot less time to just create the project calendar and make every other Friday non-working days.
    Regards,

    Gary
    (It's been a while!)

  3. #3
    3 Star Lounger
    Join Date
    Sep 2002
    Posts
    210
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Re: Setting up a Flex Fridy Base Calendar (2002 SP2)

    Thanks. That's what I thought but I wanted to confirm.