Results 1 to 3 of 3
  1. #1
    3 Star Lounger
    Join Date
    Nov 2001
    Location
    Upstate, South Carolina, USA
    Posts
    253
    Thanks
    0
    Thanked 0 Times in 0 Posts

    AutoPreview - More Lines (MSO 2003, sp2)

    Is there a way to increase the number of lines AutoPreview displays? Some add-in code maybe?

    What I want to do is this. I have a project that has subprojects each with their own set of tasks. The view I am using shows the fields - Complete, Priority, Subject and Due Date. In the Task folder I want to see the entire contents of the Notes field for every task. Why? When I print or view a subproject (or the entire project) electronically, I do not want to have to open a task to see all the notes.

    Including the Notes field in the view is less useful than AutoPreview since this field is truncated even more than AP.

    Thanks,
    Al
    "Do or do not do. There is no try." -- Yoda
    <img src=/S/flags/USA.gif border=0 alt=USA width=30 height=18>

  2. #2
    Plutonium Lounger
    Join Date
    Mar 2002
    Posts
    84,353
    Thanks
    0
    Thanked 29 Times in 29 Posts

    Re: AutoPreview - More Lines (MSO 2003, sp2)

    Sorry, the number of lines displayed in AutoPreview is hard-coded, it cannot be changed.

  3. #3
    3 Star Lounger
    Join Date
    Nov 2001
    Location
    Upstate, South Carolina, USA
    Posts
    253
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Re: AutoPreview - More Lines (MSO 2003, sp2)

    I suspected as much ... Thanks, Hans.

    Regards,
    Al
    "Do or do not do. There is no try." -- Yoda
    <img src=/S/flags/USA.gif border=0 alt=USA width=30 height=18>

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •